Tables 12: Construction Estimating Checklist

This is the checklist I used when estimating a new or renovated building before giving a client a price quote. I found it useful to prevent me from forgetting to charge for a certain material or stage of the construction. I hope it is useful to you, as well.



Name Of Project: ________________________

Legal
	Permits _________
	Plans _________
Surveying
	Surveyors _________
Excavation and Backfill
	Batter boards _________
	Rentals
		- Transit/Level _________
		- Compactor _________
	Excavator _________
Forms
	Footings
		- Sides and ends _________
		- Stakes _________
		- Cleats _________
		- Braces _________
	Walls
		- Plywood _________
		- 1x8 Resawn _________
		- Bulkheads _________
		- Studs _________
		- Walers _________
		- Braces _________
		- Snapties - 8 3/4" ends _________
		- Wedges _________
		- Easy strip ties _________
		- Rental of tie bars, forms, etc. _________
		- Nails
			- 2" _________
			- 3" _________
		- Anchor bolts (embedded items) _________
		- Beam and post saddles _________
	Slab
		- Poly _________
		- Mesh (rebar) _________
		- Screeds _________
	Columns
		- Sonotube _________
	Beam pads _________
	Rentals
		- Scaffolding _________
 		- Concrete vibrators _________
		- Concrete trowels _________
		- Concrete pumps _________
		- Mixers (truck stand-by) _________
		- Tank sprayers (oil) _________
Concrete
	Footings _________
	Walls _________
	Slab _________
	Sealcoat _________
	Columns, beam pads _________
Re-Bar
	Footings _________
	Walls _________
	Slab _________
	Columns _________
	Beam pads _________
	Tie Wire _________
Perimeter Drains and Rain Water Leaders
	4" Solid Pipe _________
	4" Perf Pipe _________
	3" Solid pipe _________
	Fittings
		- 45's _________
		- Tees _________
		- Clean outs _________
		- Glue _________
Basement Framing
	Walls _________
	Braces _________
Crawl Space
	Polyethylene _________
	Vents _________
	Built up beams _________
	Posts or pony walls _________
Sub-Floors
	Sill plate _________
	Sill gasket (4" or 6") - 80 foot roll each _________
	Joists
		- Single and double _________
		- Box _________
		- Headers, trimmers, tail _________
		- Joist hangers _________
	Bridging
		- Solid _________
		- Herring bone _________
	Plywood 5/8" T & G _________
	Sub-floor adhesive - 325 ml tubes _________
	Nails
		- 1 3/4" to 2" ring _________
		- 2 1/4" _________
		- 3 1/4" _________
		- 3 1/2" (header joists) _________
Stairs
	Posts _________
	Beams _________
	Decking _________
	Stringers _________
	Landings _________
	Temporary - treads and risers _________
	Finish - treads and risers _________
	Handrail
		- Newel posts
		- Top and bottom rails _________
		- Spindles or pales _________
Walls
	Plates (lin. ft. x 3 + 10% waste) _________
	Studs - pre-cut to 92 1/4" or 104 1/4" _________
	Lintels
		- Doors _________
		- Windows (include 2x6 under lintel) _________
	Gable framing _________
	Sheathing
		- Walls _________
		- Gable ends _________
		- Box joists _________
	Nails
		- 2 1/4" (6" edge 12" intermediate) _________
		- 3 1/4" _________
	Wall bracing _________
Ceiling
	Joists
		- Single and double _________
		- Box, headers, trimmers, tail _________
	Hangers _________
	Backing _________
	Beams and engineered beams _________
	Nails - 3 1/4" _________
	Poly for over partitions (top floor) _________
Roof Framing
	Rafters/trusses _________
	Trimmers and headers _________
	Lookouts _________
	Ridge board _________
	Hip and valleys - flat framing for trusses _________
	Collar ties _________
	Pony walls _________
	Continuous bridging (1 X 4) _________
 	Sheathing (7/16" - 16"; 1/2" - 24" c.c.) _________
	H-clips _________
	Fascia and barge boards _________
	Soffit frame _________
	Nails - 3 1/4" _________
Roofing
	Shinges/shakes _________
	Eave protection 25# non-perf felt 215.3 sq ft per roll _________
	Deck coverage 15# non-perf felt 430.5 sq ft per roll _________
	Ridge, hip caps 21 singles in a bundle of butts covers 29 ft _________
	Valley flashing or 2 layers of 25# felt _________
	Lap cement _________
	Roof vents _________
	Plumbing boots - 5 in 1 flex from 1 1/4" to 4" _________
	Nails - 1" or 1 1/4" galvanized roofing _________
	Roof top delivery _________
	Flashings
	 	- Step _________
 	- Wall _________
		- Front apron _________
 	- Back pan _________
Gutters and Downspouts
	4" and 5" gutters _________
	5" fascia gutters _________
	Downspouts _________
	Aluminum soffits _________
Windows and Exterior Doors
	Windows and screens _________
	Skylights _________
	Garage doors and openers _________
	Doors _________
	Locksets, hinges _________
	Jambs _________
	Threshold, weatherstrip _________
	Closer (garage) _________
	Tar paper _________
	Staples _________
	Nails
		- 2 1/4" galvanized common _________
		- 3" galvanized common _________
Plumbing and fixtures _________
Heating _________
Venting
	- Bathroom fans _________
	- Kitchen fans _________
Electrical and fixtures _________
Insulation
	Floors - 8"X15" R-28 42.6 sq ft/bundle _________
	Walls
	 	- 5 1/2"X15" R-20 49 sq ft/bundle _________
 	- 5 1/2"X23" R-20 75.1 sq ft/bundle _________
	Ceiling
 	- 8"X15" R-28 42.6 sq ft/bundle _________
 	- 8"X23" R-28 64 sq ft/bundle _________
	Attic - blown in R-40 _________
Vapour barrier - 6 mil 500/850/1000 sq ft/roll _________
Exterior Finishing
	Walls and soffits _________
	Handrails
		- Posts _________
		- Rails _________
		- Pales _________
	Stairs _________
	Gable end _________
	Tar paper _________
	Stucco _________
	Siding
		- Wood _________
		- Hardi plank _________
		- Vinyl _________
		- J-molding _________
	Flashing _________
	Drip caps _________
Interior Finishing
	Strapping _________
	Walls _________
	Ceiling _________
	Drywall
 	- Walls _________
		- Ceiling - textured/smooth _________
		- Window returns _________
		- Corner beads _________
		- Tape _________
		- Mud _________
	Moldings
		- Casing _________
		- Base _________
		- Cove _________
		- Other _________
	Window liner of wood _________
Interior Doors
	Bifolds _________
	Sliding or by pass _________
	Pocket _________
	Slabs _________
Cabinets _________
Painting _________
Flooring
	Hardwood _________
	Carpet _________
	Lino _________
Fireplace and chimney _________
Appliances _________
Labour _________
Landscaping and driveways _________
Construction and liability insurance _________
Worker's compensation insurance _________
Bank interest _________
Real estate commissions _________
Estimate time _________
Purchase time _________
Clean up time and dump charges _________
Contingency - 10% _________




Dave

(Ask Dave) (About Dave)



Your source for building tips, woodworking & furniture plans, house plans and building advice directly from Dave...

Hi, I'm Dave Osborne. With over 50 years experience as a journeyman carpenter, foreman and contractor in heavy construction I enjoyed working with apprentices and sharing the tricks of the trade that others shared with me. Now I get emails from Members all over the world and we include many of my answers in our Free Monthly Newsletters. Some of my answers include drawings and instructions specific to a project, but may also answer your questions. I use correct construction terminology, so you can confidently inform your building supply dealers or contractors exactly what you need.

ASK DAVE!

The Benefits of Membership

Membership gives you full access to our hundreds of how-to articles, woodworking plans, converters, calculators and tables. Our Stair Calculator is one of the most popular on the internet. We have projects you can build for (and with) your kids, furniture for your wife, and sheds and gazebos. If you run into a problem or need advice your Membership includes unlimited email questions to me through our Ask Dave quick response button.